Teraco Johannesburg Bredell Campus
Teraco Johannesburg Bredell Campus is an operational data center operated by Teraco Data Environments in Johannesburg, South Africa. Our footprint estimate of its power is about 3.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Teraco Data Environments |
| Facility power | 3.9 MW (range 1.6 MW to 9.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 32,786 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 22 networks, 1 internet exchanges PeeringDB. |
| Also known as | Teraco JB2 Bredell Campus |
| Address | 1 Riverfields Boulevard, Bredell |
| Coordinates | -26.07414, 28.27846 |
| Website | teraco.co.za/data-centre-locations |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Teraco Johannesburg Bredell Campus use?
We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.
Who operates Teraco Johannesburg Bredell Campus?
Teraco Data Environments.
Data centers near Johannesburg
- JB2 Data Centre 148 m · 16 MW
- Teraco JB4 Data Centre 5.6 km · 31 MW
- Teraco JB5 Isando Campus 10.3 km · 2.7 MW
- OADC JNB1 - Johannesburg 10.5 km · 3.6 MW
- Teraco JB3 Data Centre 10.6 km · 24 MW
- Teraco Johannesburg Campus, South Africa 10.8 km · 1.8 MW
- Equinix JN1 - Johannesburg 12.1 km · 9.7 MW
- BT Games 12.6 km
More Teraco Data Environments data centers
- Teraco CT2 Cape Town, South Africa South Africa
- Teraco Johannesburg Campus, South Africa South Africa
- Teraco CT1 Cape Town, South Africa South Africa
- Teraco DB1 Durban, South Africa South Africa
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.