Data Center Directory

OADC JNB1 - Johannesburg

OADC JNB1 - Johannesburg is an operational data center operated by Open Access Data Centres in Johannesburg, South Africa. Our footprint estimate of its power is about 3.6 MW.

Key facts

StatusOperational
OperatorOpen Access Data Centres
Facility power3.6 MW (range 1.4 MW to 8.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 29,656 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks10 networks, 1 internet exchanges
PeeringDB.
Also known asTeraco JB3 Isando Campus · OADC Isando
Address18 Electron Avenue, Isando
Coordinates-26.13608, 28.19910
Websiteopenaccessdc.net

Satellite view

Questions

How much power does OADC JNB1 - Johannesburg use?

We estimate the facility power at about 3.6 MW. Estimate from building footprint, low confidence.

Who operates OADC JNB1 - Johannesburg?

Open Access Data Centres.

Data centers near Johannesburg

More Open Access Data Centres data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.