Data Center Directory

Teraco JB4 Data Centre

Teraco JB4 Data Centre is an operational data center operated by Teraco in Thembisa, South Africa. Our footprint estimate of its power is about 31 MW.

Key facts

StatusOperational
OperatorTeraco
Facility power31 MW (range 15 MW to 49 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 25,549 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 13,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-26.02442, 28.26940

Satellite view

Questions

How much power does Teraco JB4 Data Centre use?

We estimate the facility power at about 31 MW. Estimate from building footprint, low confidence.

Who operates Teraco JB4 Data Centre?

Teraco.

Data centers near Thembisa

More Teraco data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.