Teraco JB4 Data Centre
Teraco JB4 Data Centre is an operational data center operated by Teraco in Thembisa, South Africa. Our footprint estimate of its power is about 31 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Teraco |
| Facility power | 31 MW (range 15 MW to 49 MW) Estimate from building footprint, low confidence. Footprint estimate: about 25,549 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -26.02442, 28.26940 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Teraco JB4 Data Centre use?
We estimate the facility power at about 31 MW. Estimate from building footprint, low confidence.
Who operates Teraco JB4 Data Centre?
Teraco.
Data centers near Thembisa
- Teraco Johannesburg Bredell Campus 5.6 km · 3.9 MW
- JB2 Data Centre 5.7 km · 16 MW
- Teraco JB5 Isando Campus 14.1 km · 2.7 MW
- OADC JNB1 - Johannesburg 14.3 km · 3.6 MW
- Teraco JB3 Data Centre 14.4 km · 24 MW
- Teraco Johannesburg Campus, South Africa 14.5 km · 1.8 MW
- Bunker One 14.7 km
- Africa Data Centres, Johannesburg JHB1, South Africa 15.1 km · 13 MW
More Teraco data centers
- Teraco JB3 Data Centre South Africa
- JB2 Data Centre South Africa
- Teraco JB5 Isando Campus South Africa
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.