Teraco JB3 Data Centre
Teraco JB3 Data Centre is an operational data center operated by Teraco in Eden Glen, South Africa. Our footprint estimate of its power is about 24 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Teraco |
| Facility power | 24 MW (range 12 MW to 38 MW) Estimate from building footprint, low confidence. Footprint estimate: about 19,644 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 10,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Teraco Satellite Earth Station |
| Coordinates | -26.13726, 28.19919 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Teraco JB3 Data Centre use?
We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.
Who operates Teraco JB3 Data Centre?
Teraco.
Data centers near Eden Glen
- OADC JNB1 - Johannesburg 132 m · 3.6 MW
- Teraco Johannesburg Campus, South Africa 185 m · 1.8 MW
- Teraco JB5 Isando Campus 303 m · 2.7 MW
- Equinix JN1 - Johannesburg 2.1 km · 9.7 MW
- BT Games 6.5 km
- Telkom data center in Germiston 9.2 km · 1 MW
- JB2 Data Centre 10.4 km · 16 MW
- Teraco Johannesburg Bredell Campus 10.6 km · 3.9 MW
More Teraco data centers
- Teraco JB4 Data Centre South Africa
- JB2 Data Centre South Africa
- Teraco JB5 Isando Campus South Africa
Sources
Correct this page or get the data