Teraco JB5 Isando Campus
Teraco JB5 Isando Campus is an operational data center operated by Teraco in Eden Glen, South Africa. Our footprint estimate of its power is about 2.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Teraco |
| Facility power | 2.7 MW (range 1.1 MW to 6.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 22,449 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Teraco JB5 Data Centre |
| Coordinates | -26.13497, 28.20083 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Teraco JB5 Isando Campus use?
We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.
Who operates Teraco JB5 Isando Campus?
Teraco.
Data centers near Eden Glen
- OADC JNB1 - Johannesburg 212 m · 3.6 MW
- Teraco JB3 Data Centre 303 m · 24 MW
- Teraco Johannesburg Campus, South Africa 469 m · 1.8 MW
- Equinix JN1 - Johannesburg 2.4 km · 9.7 MW
- BT Games 6.6 km
- Telkom data center in Germiston 9.5 km · 1 MW
- JB2 Data Centre 10.1 km · 16 MW
- Teraco Johannesburg Bredell Campus 10.3 km · 3.9 MW
More Teraco data centers
- Teraco JB4 Data Centre South Africa
- Teraco JB3 Data Centre South Africa
- JB2 Data Centre South Africa
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.