Data Center Directory

Teraco JB5 Isando Campus

Teraco JB5 Isando Campus is an operational data center operated by Teraco in Eden Glen, South Africa. Our footprint estimate of its power is about 2.7 MW.

Key facts

StatusOperational
OperatorTeraco
Facility power2.7 MW (range 1.1 MW to 6.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 22,449 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asTeraco JB5 Data Centre
Coordinates-26.13497, 28.20083

Satellite view

Questions

How much power does Teraco JB5 Isando Campus use?

We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.

Who operates Teraco JB5 Isando Campus?

Teraco.

Data centers near Eden Glen

More Teraco data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.