JB2 Data Centre is an operational data center operated by Teraco in Thembisa, South Africa. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Teraco |
| Facility power | 16 MW (range 8 MW to 26 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,317 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -26.07532, 28.27777 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does JB2 Data Centre use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
Who operates JB2 Data Centre?
Teraco.
Data centers near Thembisa
- Teraco Johannesburg Bredell Campus 148 m · 3.9 MW
- Teraco JB4 Data Centre 5.7 km · 31 MW
- Teraco JB5 Isando Campus 10.1 km · 2.7 MW
- OADC JNB1 - Johannesburg 10.4 km · 3.6 MW
- Teraco JB3 Data Centre 10.4 km · 24 MW
- Teraco Johannesburg Campus, South Africa 10.6 km · 1.8 MW
- Equinix JN1 - Johannesburg 12.0 km · 9.7 MW
- BT Games 12.5 km
More Teraco data centers
- Teraco JB4 Data Centre South Africa
- Teraco JB3 Data Centre South Africa
- Teraco JB5 Isando Campus South Africa
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.