Teraco Johannesburg Campus, South Africa is an operational data center operated by Teraco Data Environments in Johannesburg, South Africa. Our footprint estimate of its power is about 1.8 MW.

Key facts

StatusOperational
OperatorTeraco Data Environments
Facility power1.8 MW (range 0.7 MW to 4.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 14,977 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 770 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks392 networks, 6 internet exchanges
PeeringDB.
Also known asTeraco JB1 Isando Campus · Teraco JB1 West · Teraco JB1 East
Address5 Brewery Street, Isando
Coordinates-26.13796, 28.19752
Websiteteraco.co.za

Satellite view

Questions

How much power does Teraco Johannesburg Campus, South Africa use?

We estimate the facility power at about 1.8 MW. Estimate from building footprint, low confidence.

Who operates Teraco Johannesburg Campus, South Africa?

Teraco Data Environments.

Data centers near Johannesburg

More Teraco Data Environments data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.