Teraco Johannesburg Campus, South Africa is an operational data center operated by Teraco Data Environments in Johannesburg, South Africa. Our footprint estimate of its power is about 1.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Teraco Data Environments |
| Facility power | 1.8 MW (range 0.7 MW to 4.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,977 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 770 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 392 networks, 6 internet exchanges PeeringDB. |
| Also known as | Teraco JB1 Isando Campus · Teraco JB1 West · Teraco JB1 East |
| Address | 5 Brewery Street, Isando |
| Coordinates | -26.13796, 28.19752 |
| Website | teraco.co.za |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Teraco Johannesburg Campus, South Africa use?
We estimate the facility power at about 1.8 MW. Estimate from building footprint, low confidence.
Who operates Teraco Johannesburg Campus, South Africa?
Teraco Data Environments.
Data centers near Johannesburg
- Teraco JB3 Data Centre 185 m · 24 MW
- OADC JNB1 - Johannesburg 262 m · 3.6 MW
- Teraco JB5 Isando Campus 469 m · 2.7 MW
- Equinix JN1 - Johannesburg 2.0 km · 9.7 MW
- BT Games 6.6 km
- Telkom data center in Germiston 9.1 km · 1 MW
- JB2 Data Centre 10.6 km · 16 MW
- Teraco Johannesburg Bredell Campus 10.8 km · 3.9 MW
More Teraco Data Environments data centers
- Teraco CT2 Cape Town, South Africa South Africa
- Teraco Johannesburg Bredell Campus South Africa
- Teraco CT1 Cape Town, South Africa South Africa
- Teraco DB1 Durban, South Africa South Africa
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.