Data Center Directory

Microsoft MEL07

Microsoft MEL07 is an operational data center operated by Microsoft in Gladstone Park, Australia. Our footprint estimate of its power is about 39 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power39 MW (range 19 MW to 62 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 32,173 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 17,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressGarden Drive 70-90
Coordinates-37.68555, 144.87492

Satellite view

Questions

How much power does Microsoft MEL07 use?

We estimate the facility power at about 39 MW. Estimate from building footprint, low confidence.

What chips does Microsoft MEL07 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Who operates Microsoft MEL07?

Microsoft.

Data centers near Gladstone Park

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.