ANZ Data Centre
ANZ Data Centre is an operational data center operated by ANZ in Gladstone Park, Australia. Our footprint estimate of its power is about 8.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | ANZ |
| Facility power | 8.5 MW (range 4.2 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,074 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Hewitt Way 20 |
| Coordinates | -37.68812, 144.87719 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does ANZ Data Centre use?
We estimate the facility power at about 8.5 MW. Estimate from building footprint, low confidence.
Who operates ANZ Data Centre?
ANZ.
Data centers near Gladstone Park
- Microsoft MEL07 349 m · 39 MW
- NEXTDC M2 2.2 km
- NEXTDC M3 12.9 km · 5.8 MW
- Digital Realty MEL11 - Melbourne 13.6 km · 3.8 MW
- Equinix ME4 - Melbourne, Derrimut (formerly Metronode Melbourne 2) 13.8 km · 8.3 MW
- Soul DataCentre 13.9 km · 1.1 MW
- CDC Brooklyn Campus 14.6 km · 15 MW
- CDC Melbourne BK1 14.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.