CDC Brooklyn Campus
CDC Brooklyn Campus is an operational data center operated by CDC in Altona North, Australia. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CDC |
| Facility power | 15 MW (range 6 MW to 38 MW) Estimate from building footprint, low confidence. Footprint estimate: about 125,646 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | BK1 · BK2 |
| Coordinates | -37.81692, 144.84395 |
| Website | cdc.com/locations/melbourne |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CDC Brooklyn Campus use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
Who operates CDC Brooklyn Campus?
CDC.
Data centers near Altona North
- CDC Melbourne BK1 212 m
- Microsoft MEL05 1.3 km · 17 MW
- NEXTDC M3 2.4 km · 5.8 MW
- VicTrack data center in Newport 4.0 km · 8.3 MW
- Equinix ME4 - Melbourne, Derrimut (formerly Metronode Melbourne 2) 6.1 km · 8.3 MW
- Equinix ME1/ME2 - Melbourne 6.3 km · 13 MW
- AirTrunk MEL1 6.4 km · 10 MW
- AirTrunk data center in Derrimut 6.6 km · 15 MW
More CDC data centers
- CDC Eastern Creek Campus EC5 Australia
- CDC Laverton Australia
- CDC Hume Datacentre 3 Australia
- CDC Data Centre HV1A New Zealand
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.