Data Center Directory

Microsoft Grange Castle

Microsoft Grange Castle is an operational data center operated by Microsoft in Clondalkin, Ireland. Our footprint estimate of its power is about 111 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power111 MW (range 44 MW to 277 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 922,028 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 47,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMicrosoft DUB07 · Microsoft DUB09 · Microsoft DUB10 · Microsoft DUB12
Coordinates53.32252, -6.44716

Satellite view

Questions

How much power does Microsoft Grange Castle use?

We estimate the facility power at about 111 MW. Estimate from building footprint, low confidence.

What chips does Microsoft Grange Castle use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Who operates Microsoft Grange Castle?

Microsoft.

Data centers near Clondalkin

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.