Data center in Clondalkin
Data center in Clondalkin is an operational data center in Clondalkin, Ireland. Our footprint estimate of its power is about 21 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 21 MW (range 11 MW to 34 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,790 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 53.31839, -6.45111 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Clondalkin use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
Data centers near Clondalkin
- Data center in Clondalkin 194 m · 22 MW
- Data center in Clondalkin 204 m
- Microsoft DUB13 326 m · 12 MW
- CyrusOne DUB1 390 m · 37 MW
- Microsoft DUB14 391 m · 14 MW
- Google 401 m · 29 MW
- Data center in Clondalkin 473 m · 18 MW
- Microsoft Grange Castle 528 m · 111 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.