Microsoft DUB03 / DUB04
Microsoft DUB03 / DUB04 is an operational data center operated by Microsoft in Lucan, Ireland. Our footprint estimate of its power is about 65 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 65 MW (range 32 MW to 104 MW) Estimate from building footprint, low confidence. Footprint estimate: about 53,975 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 28,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Microsoft DUB05 |
| Coordinates | 53.32483, -6.45426 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft DUB03 / DUB04 use?
We estimate the facility power at about 65 MW. Estimate from building footprint, low confidence.
What chips does Microsoft DUB03 / DUB04 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
Who operates Microsoft DUB03 / DUB04?
Microsoft.
Data centers near Lucan
- Digital Realty Dublin DUB3 259 m
- Microsoft DUB14 384 m · 14 MW
- EdgeConnex DUB04 405 m · 27 MW
- EdgeConneX data center in Lucan 411 m · 11 MW
- Microsoft Grange Castle 537 m · 111 MW
- Data center in Lucan 607 m · 29 MW
- Data center in Clondalkin 612 m
- Data center in Clondalkin 746 m · 21 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.