NEXTDC S3
NEXTDC S3 is an operational data center operated by NEXTDC in Artarmon, Australia. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NEXTDC |
| Facility power | 13 MW (range 6.5 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,869 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 20 networks, 2 internet exchanges PeeringDB. |
| Also known as | NEXTDC - S3 Sydney |
| Address | 2 Broadcast Way |
| Coordinates | -33.81934, 151.18503 |
| Website | nextdc.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NEXTDC S3 use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
Who operates NEXTDC S3?
NEXTDC.
Data centers near Artarmon
- Keppel Data Centres | Keppel DC Sydney 1 84 m · 5.2 MW
- DigiCo Sydney SYD2 (iseek GH) 138 m · 4.5 MW
- Telstra InfraCo - St Leonards Data Centre 595 m · 25 MW
- Syncom S4 761 m
- Data center in Artarmon 907 m
- AirTrunk Sydney North 3.9 km · 26 MW
- TPG Data Centre 5.2 km
- Powertel Data Centre 5.4 km
More NEXTDC data centers