NEXTDC C1

NEXTDC C1 is an operational data center operated by NEXTDC in Bruce, Australia. Our footprint estimate of its power is about 6.8 MW.

Key facts

StatusOperational
OperatorNEXTDC
Facility power6.8 MW (range 3.4 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,679 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks19 networks, 2 internet exchanges
PeeringDB.
Also known asCanberra 1
Address19 Battye Street
Coordinates-35.24531, 149.09624
Websitenextdc.com

Satellite view

Questions

How much power does NEXTDC C1 use?

We estimate the facility power at about 6.8 MW. Estimate from building footprint, low confidence.

Who operates NEXTDC C1?

NEXTDC.

Data centers near Bruce

More NEXTDC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.