NEXTDC D1
NEXTDC D1 is an operational data center operated by NEXTDC in Darwin, Australia. Our footprint estimate of its power is about 1.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NEXTDC |
| Facility power | 1.5 MW (range 0.8 MW to 2.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,272 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 640 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 10 networks, 1 internet exchanges PeeringDB. |
| Also known as | NEXTDC Darwin D1 |
| Address | 2 Harvey Street |
| Coordinates | -12.45675, 130.84357 |
| Website | nextdc.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NEXTDC D1 use?
We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.
Who operates NEXTDC D1?
NEXTDC.
Data centers near Darwin
- Secure Data Centre 280 m
- Area9 Data Center 5.3 km
More NEXTDC data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.