Data Center Directory

NEXTDC P2

NEXTDC P2 is an operational data center operated by NEXTDC in Perth, Australia. Our footprint estimate of its power is about 48 MW.

Key facts

StatusOperational
OperatorNEXTDC
Facility power48 MW (range 24 MW to 77 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,658 m² building outline x 6 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 21,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks53 networks, 3 internet exchanges
PeeringDB.
Also known asNextDC P2 Perth Data Centre
Address105 Lord Street
Coordinates-31.95009, 115.86819
Websitenextdc.com

Satellite view

Questions

How much power does NEXTDC P2 use?

We estimate the facility power at about 48 MW. Estimate from building footprint, low confidence.

Who operates NEXTDC P2?

NEXTDC.

Data centers near Perth

More NEXTDC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.