NEXTDC S2
NEXTDC S2 is an operational data center operated by NEXTDC in Macquarie Park, Australia. Our footprint estimate of its power is about 7.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NEXTDC |
| Facility power | 7.8 MW (range 3.9 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,459 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 25 networks, 3 internet exchanges PeeringDB. |
| Also known as | NEXTDC - S2 Sydney |
| Address | 6/8 Giffnock Ave |
| Coordinates | -33.78513, 151.12530 |
| Website | nextdc.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NEXTDC S2 use?
We estimate the facility power at about 7.8 MW. Estimate from building footprint, low confidence.
Who operates NEXTDC S2?
NEXTDC.
Data centers near Macquarie Park
- Intellicentre 2 (IC2) 510 m · 7.2 MW
- NEXTDC S1 572 m · 34 MW
- AWS Asia Pacific (Sydney) Region Data Centre 582 m · 15 MW
- Fujitsu North Ryde 632 m · 14 MW
- AirTrunk Sydney North 3.1 km · 26 MW
- NEXTDC S3 6.7 km · 13 MW
- Keppel Data Centres | Keppel DC Sydney 1 6.8 km · 5.2 MW
- DigiCo Sydney SYD2 (iseek GH) 6.8 km · 4.5 MW
More NEXTDC data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.