CyrusOne NJ-1 is an operational data center operated by CyrusOne in Somerset, United States. Our footprint estimate of its power is about 40 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power40 MW (range 20 MW to 64 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 33,409 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 17,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks3 networks
PeeringDB.
Address800 Cottontail Lane
Coordinates40.53822, -74.54602
Websitecyrusone.com/locations/new-jersey/somerset-i

Satellite view

Questions

How much power does CyrusOne NJ-1 use?

We estimate the facility power at about 40 MW. Estimate from building footprint, low confidence.

Who operates CyrusOne NJ-1?

CyrusOne.