CyrusOne NC-1
CyrusOne NC-1 is an operational data center operated by CyrusOne in Durham, United States. Our footprint estimate of its power is about 43 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 43 MW (range 21 MW to 68 MW) Estimate from building footprint, low confidence. Footprint estimate: about 35,462 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 18,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 6 networks PeeringDB. |
| Address | 2223 NE Creek Parkway |
| Coordinates | 35.93634, -78.87994 |
| Website | cyrusone.com/locations/north-carolina/north-carolina-data-center-raleigh-durham-i |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne NC-1 use?
We estimate the facility power at about 43 MW. Estimate from building footprint, low confidence.
Who operates CyrusOne NC-1?
CyrusOne.
Data centers near Durham
- CyrusOne data center in Durham 287 m · 8.3 MW
- TierPoint Research Triangle Park – RTP 4.4 km
- vXchnge Raleigh-Durham (NC01) 5.3 km
- Windstream Communications 6.6 km
- Brandaleone Lab for Data and Visualization 9.1 km
- Flexential - Raleigh (RAL01/02/03) 10.7 km
- iGLASS Networks 20.7 km · 1.1 MW
- American Tower RA1 21.5 km
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NJ-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.