ATI Solutions
ATI Solutions is an operational data center operated by ATI Solutions in Chantilly, United States. Our footprint estimate of its power is about 3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | ATI Solutions |
| Facility power | 3 MW (range 1.5 MW to 4.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,507 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Address | 4227 Lafayette Center Drive |
| Coordinates | 38.90814, -77.47526 |
| Website | atisolutions.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does ATI Solutions use?
We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.
Who operates ATI Solutions?
ATI Solutions.
Data centers near Chantilly
- H5 Data Centers Virginia (4030) 324 m · 20 MW
- 4120 Lafayette Center Drive 593 m · 4.7 MW
- Amazon IAD-150 899 m · 63 MW
- Data center in South Riding 1.6 km · 13 MW
- Amazon IAD-61 1.7 km · 32 MW
- Amazon IAD-156 1.7 km · 14 MW
- Amazon IAD-135 1.8 km · 21 MW
- Amazon IAD-86 2.0 km · 16 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.