Data Center Directory

Microsoft

Microsoft is an operational data center operated by Microsoft in Mucurapo, Trinidad & Tobago. Our footprint estimate of its power is about 0.9 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power0.9 MW (range 0.4 MW to 1.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 742 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 380 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressMucurapo Road, Mucurapo
Coordinates10.67177, -61.53936

Satellite view

Questions

How much power does Microsoft use?

We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.

What chips does Microsoft use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Who operates Microsoft?

Microsoft.