Data Center Directory

Microsoft MAD01

Microsoft MAD01 is an operational data center operated by Microsoft in Algete, Spain. Our footprint estimate of its power is about 10 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power10 MW (range 5.1 MW to 16 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,539 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 4,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.59326, -3.54977

Satellite view

Questions

How much power does Microsoft MAD01 use?

We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.

What chips does Microsoft MAD01 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Who operates Microsoft MAD01?

Microsoft.

Data centers near Algete

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.