Interxion CPH03
Interxion CPH03 is an operational data center in Ballerup, Denmark. Our footprint estimate of its power is about 5.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.9 MW (range 2.9 MW to 9.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,894 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | 2020-12-01 |
| Coordinates | 55.72666, 12.37995 |
| Website | interxion.com/locations/europe/copenhagen/cph3 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Interxion CPH03 use?
We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.
Data centers near Ballerup
- Digital Realty Copenhagen CPH1-3 222 m · 8.9 MW
- Interxion CPH02 229 m · 16 MW
- Cibicom Datacenter Ballerup 230 m
- atNorth DEN01 3.0 km
- Aeven data center in Rødovre 4.4 km · 2 MW
- GlobalConnect Glostrup 4.5 km · 2.5 MW
- Penta Infra Copenhagen CPH01 5.0 km
- Adeo Datacenter 6.6 km · 4.1 MW