Interxion CPH02
Interxion CPH02 is an operational data center in Ballerup, Denmark. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 16 MW (range 7.9 MW to 25 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,247 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 55.72654, 12.37630 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Interxion CPH02 use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
Data centers near Ballerup
- Digital Realty Copenhagen CPH1-3 188 m · 8.9 MW
- Interxion CPH03 229 m · 5.9 MW
- Cibicom Datacenter Ballerup 437 m
- atNorth DEN01 3.2 km
- Aeven data center in Rødovre 4.5 km · 2 MW
- GlobalConnect Glostrup 4.6 km · 2.5 MW
- Penta Infra Copenhagen CPH01 5.1 km
- Adeo Datacenter 6.6 km · 4.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.