Adeo Datacenter is an operational data center operated by Adeo DC ApS in Albertslund, Denmark. Our footprint estimate of its power is about 4.1 MW.

Key facts

StatusOperational
OperatorAdeo DC ApS
Facility power4.1 MW (range 2 MW to 6.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,382 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks7 networks
PeeringDB.
Also known asAdeo Datacenter ApS
Addressherstedvang 8
Coordinates55.66773, 12.36782
Websiteadeodc.com

Satellite view

Questions

How much power does Adeo Datacenter use?

We estimate the facility power at about 4.1 MW. Estimate from building footprint, low confidence.

Who operates Adeo Datacenter?

Adeo DC ApS.