Digital Realty Copenhagen CPH1-3 is an operational data center operated by Digital Realty in Copenhagen, Denmark. Our footprint estimate of its power is about 8.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Realty |
| Facility power | 8.9 MW (range 4.5 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,431 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 99 networks, 7 internet exchanges PeeringDB. |
| Also known as | Digital Realty Copenhagen CPH2 · Digital Realty Copenhagen CPH1 |
| Address | Industriparken 20A, Ballerup |
| Coordinates | 55.72809, 12.37748 |
| Website | digitalrealty.com/data-centers/copenhagen/industriparken-area-ballerup-denmark |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Digital Realty Copenhagen CPH1-3 use?
We estimate the facility power at about 8.9 MW. Estimate from building footprint, low confidence.
Who operates Digital Realty Copenhagen CPH1-3?
Digital Realty.
Data centers near Copenhagen
- Interxion CPH02 188 m · 16 MW
- Interxion CPH03 222 m · 5.9 MW
- Cibicom Datacenter Ballerup 333 m
- atNorth DEN01 3.2 km
- Aeven data center in Rødovre 4.6 km · 2 MW
- GlobalConnect Glostrup 4.7 km · 2.5 MW
- Penta Infra Copenhagen CPH01 5.2 km
- Adeo Datacenter 6.7 km · 4.1 MW
More Digital Realty data centers
- Digital Realty CH1 - Chicago United States
- Digital Realty IAD39 United States
- Digital Realty IAD51 United States
- Digital Realty IAD44 United States
- Digital Realty IAD41 United States
- Digital Realty Singapore SIN11 Singapore
- Digital Realty Toronto YYZ11 Canada
- Digital Realty IAD43 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.