Data Center Directory

ELN02

ELN02 is an operational data center operated by Applied Digital in Ellendale, United States. Our footprint estimate of its power is about 29 MW. Likely chips: NVIDIA GPUs (AMD possible) (guess).

Key facts

StatusOperational
OperatorApplied Digital
Facility power29 MW (range 12 MW to 72 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 241,050 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (AMD possible)
Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD.
GPU capacity if all AIabout 12,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asApplied Digital / Ellendale Data Center
Address9663 87th Avenue SE
Coordinates46.01282, -98.56988
Websiteapplieddigital.com

Power and grid

UtilityDakota Valley Elec Coop INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Grid carbon intensity539 g CO₂ per kWh (North Dakota, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 53.3%, wind 36.3%, hydro 5.2%, gas 5.1%. Clean power: 41.5%
Industrial power priceUSD 0.081 per kWh (North Dakota, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature6.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.9 °C (2001 to 2025)
Cooling degree days379 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.01 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (North Dakota)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does ELN02 use?

We estimate the facility power at about 29 MW. Estimate from building footprint, low confidence.

What chips does ELN02 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).

How clean is the power for ELN02?

The grid in North Dakota emits about 539 g CO₂ per kWh (2025). Largest sources: coal 53.3%, wind 36.3%, hydro 5.2%.

Who operates ELN02?

Applied Digital.

Data centers near Ellendale

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.