Data center in Aberdeen
Data center in Aberdeen is an operational data center in Aberdeen, United States. Our footprint estimate of its power is about 7.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 7.3 MW (range 3.7 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,110 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 46.01240, -98.57374 |
Power and grid
| Utility | Dakota Valley Elec Coop INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Grid carbon intensity | 539 g CO₂ per kWh (North Dakota, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 53.3%, wind 36.3%, hydro 5.2%, gas 5.1%. Clean power: 41.5% |
| Industrial power price | USD 0.081 per kWh (North Dakota, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 6.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.9 °C (2001 to 2025) |
| Cooling degree days | 379 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.01 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (North Dakota) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Aberdeen use?
We estimate the facility power at about 7.3 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Aberdeen?
The grid in North Dakota emits about 539 g CO₂ per kWh (2025). Largest sources: coal 53.3%, wind 36.3%, hydro 5.2%.
Data centers near Aberdeen
- Data center in Aberdeen 202 m · 5.2 MW
- ELN02 302 m · 29 MW
- CoreWeave Ellendale ND 457 m · 88 MW
Sources
Correct this page or get the data