EdgeConneX Toronto (EDCTOR01)

EdgeConneX Toronto (EDCTOR01) is an operational data center operated by EdgeConneX in North York, Canada. Our footprint estimate of its power is about 5.3 MW.

Key facts

StatusOperational
OperatorEdgeConneX
Facility power5.3 MW (range 2.6 MW to 8.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,397 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asEdgeconnex Toronto
Address565 Gordon Baker Rd
Coordinates43.80952, -79.34270
Websiteedgeconnex.com

Satellite view

Questions

How much power does EdgeConneX Toronto (EDCTOR01) use?

We estimate the facility power at about 5.3 MW. Estimate from building footprint, low confidence.

Who operates EdgeConneX Toronto (EDCTOR01)?

EdgeConneX.

Data centers near North York

More EdgeConneX data centers