Data center in Markham
Data center in Markham is an operational data center in Markham, Canada. Our footprint estimate of its power is about 25 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 25 MW (range 13 MW to 40 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,843 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Markham |
| Coordinates | 43.83335, -79.32054 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Markham use?
We estimate the facility power at about 25 MW. Estimate from building footprint, low confidence.
Data centers near Markham
- Digital Realty YYZ10 Toronto (371 Gough) 604 m · 14 MW
- Cyxtera Toronto YYZ2 626 m · 19 MW
- Centersquare Toronto (YYZ2) 722 m
- Nuday DC1 1.3 km · 2.4 MW
- Equinix TR5 - Toronto 1.8 km · 12 MW
- Rogers 2.0 km · 8.6 MW
- Cologix TOR4 2.6 km · 26 MW
- EdgeConneX Toronto (EDCTOR01) 3.2 km · 5.3 MW