Rogers Data Center
Rogers Data Center is an operational data center in Steeles, Canada. Our footprint estimate of its power is about 7.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 7.9 MW (range 4 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,589 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Cochrane Drive 550 |
| Coordinates | 43.84429, -79.36486 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Rogers Data Center use?
We estimate the facility power at about 7.9 MW. Estimate from building footprint, low confidence.
Data centers near Steeles
- Pathway Communications 1.6 km
- Cologix TOR4 1.9 km · 26 MW
- Equinix TR5 - Toronto 2.5 km · 12 MW
- Rogers 2.6 km · 8.6 MW
- Nuday DC1 3.1 km · 2.4 MW
- Digital Realty YYZ10 Toronto (371 Gough) 3.4 km · 14 MW
- Data center in Markham 3.8 km · 25 MW
- Cyxtera Toronto YYZ2 3.9 km · 19 MW
Sources
Correct this page or get the data