Element Critical Chicago CH2
Element Critical Chicago CH2 is an operational data center operated by Element Critical in Wood Dale, United States. Our footprint estimate of its power is about 7.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Element Critical |
| Facility power | 7.8 MW (range 3.9 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,238 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks, 1 internet exchanges PeeringDB. |
| Also known as | Element Critical CH2 |
| Address | 341 Haynes Drive |
| Coordinates | 41.97405, -87.96697 |
| Website | elementcritical.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Element Critical Chicago CH2 use?
We estimate the facility power at about 7.8 MW. Estimate from building footprint, low confidence.
Who operates Element Critical Chicago CH2?
Element Critical.
Data centers near Wood Dale
- Element Critical Chicago CH1 284 m · 17 MW
- CyrusOne CHI6 479 m · 4.8 MW
- Centersquare Chicago (ORD2) 2.1 km · 43 MW
- Digital Realty CH3 - Chicago 2.2 km · 35 MW
- Skybox Chicago I 2.2 km · 50 MW
- Digital Realty CH1 - Chicago 2.3 km · 149 MW
- Digital Realty CH2 - Chicago 2.4 km · 30 MW
- Stream Data Centers - Chicago II 2.9 km · 19 MW
More Element Critical data centers
- Element Critical Chicago CH1 United States
- Element Critical Austin AUS1 United States
- Element Critical Northern Virginia VA1 United States
- Element Critical Houston HOU1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.