CyrusOne San Antonio is an operational data center operated by CyrusOne in San Antonio, United States. Our footprint estimate of its power is about 4.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 4.7 MW (range 1.9 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 38,891 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks PeeringDB. |
| Also known as | CyrusOne San Antonio I |
| Address | 9999 Westover Hills Blvd |
| Coordinates | 29.46661, -98.68808 |
| Website | cyrusone.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne San Antonio use?
We estimate the facility power at about 4.7 MW. Estimate from building footprint, low confidence.
Who operates CyrusOne San Antonio?
CyrusOne.
Data centers near San Antonio
- Frost Bank data center in Leon Valley 403 m · 11 MW
- CHRISTUS Health data center in Leon Valley 452 m · 8.9 MW
- Lowe's Data Center 725 m · 11 MW
- Microsoft SAT14 974 m · 66 MW
- Microsoft 1.1 km · 74 MW
- Microsoft SAT14 1.2 km · 18 MW
- Microsoft 1.3 km · 37 MW
- CyrusOne San Antonio II 1.5 km · 19 MW
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.