CyrusOne Austin (Met 2)

CyrusOne Austin (Met 2) is an operational data center operated by CyrusOne in Austin, United States. Our footprint estimate of its power is about 2.7 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power2.7 MW (range 1.1 MW to 6.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 22,767 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks5 networks, 1 internet exchanges
PeeringDB.
Address7301 Metropolis Drive, Bldg #6
Coordinates30.20593, -97.69791
Websitecyrusone.com

Satellite view

Questions

How much power does CyrusOne Austin (Met 2) use?

We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.

Who operates CyrusOne Austin (Met 2)?

CyrusOne.