Commissariat a l'Energie Atomique Topaze
Commissariat a l'Energie Atomique Topaze is an operational AI data center operated by French Alternative Energies and Atomic Energy Commission (CEA) in Évry, France. Its power is about 0.2 MW. Epoch AI estimates about 61 H100-equivalent AI chips (NVIDIA A100).
Key facts
| Status | Operational |
|---|---|
| Operator | French Alternative Energies and Atomic Energy Commission (CEA) |
| Facility power | 0.2 MW Reported (Epoch AI or owner data) |
| AI compute | 61 H100-equivalents |
| AI chips | NVIDIA A100 Reported (Epoch AI or owner data) |
| Chip count | 192 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 70 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Essonne, France |
| Coordinates | 48.62417, 2.42897 |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Commissariat a l'Energie Atomique Topaze | NVIDIA A100 | 192 | 0.2 MW | 2021-06-23 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Commissariat a l'Energie Atomique Topaze use?
Public data puts the facility power at about 0.2 MW. Reported (Epoch AI or owner data).
What chips does Commissariat a l'Energie Atomique Topaze use?
Reported chips: NVIDIA A100.
Who operates Commissariat a l'Energie Atomique Topaze?
French Alternative Energies and Atomic Energy Commission (CEA).
Data centers near Évry
- CDG1 3.4 km · 35 MW
- Datacenter Société Generale 5.7 km · 8.3 MW
- Datacenter Sirius 9.1 km · 14 MW
- Datacenter Bouygues Télécom 11.7 km
- MEDIACTIVE MN3 14.4 km
- Data4 Campus Nozay PAR3 14.9 km · 17 MW
- Data4 Campus Paris Saclay 15.0 km · 84 MW
- Goodman PAR02 A&B Data Centre Campus 15.1 km · 19 MW
More French Alternative Energies and Atomic Energy Commission (CEA) data centers
- CEA EXA1-HE France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.