Goodman PAR02 A&B Data Centre Campus
Goodman PAR02 A&B Data Centre Campus is a data center under construction in Choisy-le-Roi, France. Our footprint estimate of its power is about 19 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 19 MW (range 7.7 MW to 48 MW) Estimate from building footprint, low confidence. Footprint estimate: about 160,603 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 8,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.75924, 2.44849 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Goodman PAR02 A&B Data Centre Campus use?
We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.
Data centers near Choisy-le-Roi
- MEDIACTIVE MN3 2.4 km
- Datacenter Bouygues Télécom 4.1 km
- OPCORE - DC2 / PAR2 4.8 km · 3.7 MW
- OPCORE - DC3 / PAR3 5.3 km · 16 MW
- Digital Realty Paris PAR6 7.1 km · 6.7 MW
- Aqua Ray Aurora 7.9 km
- COLT DC Paris III 9.2 km
- Acropolis Telecom Paris-Nation 9.9 km