Data Center Directory

Goodman PAR02 A&B Data Centre Campus

Goodman PAR02 A&B Data Centre Campus is a data center under construction in Choisy-le-Roi, France. Our footprint estimate of its power is about 19 MW.

Key facts

StatusUnder construction
Facility power19 MW (range 7.7 MW to 48 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 160,603 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates48.75924, 2.44849

Satellite view

Questions

How much power does Goodman PAR02 A&B Data Centre Campus use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.

Data centers near Choisy-le-Roi

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.