Data4 Campus Nozay PAR3
Data4 Campus Nozay PAR3 is a data center under construction operated by Data4 in La Ville-du-Bois, France. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Under construction |
|---|---|
| Operator | Data4 |
| Facility power | 17 MW (range 7 MW to 44 MW) Estimate from building footprint, low confidence. Footprint estimate: about 145,064 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.66764, 2.23760 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data4 Campus Nozay PAR3 use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
Who operates Data4 Campus Nozay PAR3?
Data4.
Data centers near La Ville-du-Bois
- DATA4 Paris Marcoussis PAR2 1.9 km
- data4 data center in Marcoussis 2.0 km · 10 MW
- Data4 Campus Paris Saclay 2.1 km · 84 MW
- DATA4 Paris Marcoussis PAR2 2.2 km · 3.7 MW
- data4 data center in Marcoussis 2.3 km · 5.9 MW
- Data center in Orsay 2.4 km · 25 MW
- Digital Realty Paris PAR13 2.7 km
- Alionis VBO 2.9 km
More Data4 data centers
- Data4 Campus Paris Saclay France
- data4 data center in Marcoussis France
- Data 4 MAD2 Campus Spain
- DATA4 - MAD1 Spain
- data4 data center in Marcoussis France
- DATA4 Paris Marcoussis PAR2 France
- Data4 Pologne WAW2 Poland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.