CDG1 is an operational data center operated by CloudHQ in Lisses, France. Our footprint estimate of its power is about 35 MW.

Key facts

StatusOperational
OperatorCloudHQ
Facility power35 MW (range 17 MW to 56 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 29,018 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 15,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Opened2025