CDC Eastern Creek Campus EC5

CDC Eastern Creek Campus EC5 is an operational data center operated by CDC in Minchinbury, Australia. Our footprint estimate of its power is about 14 MW.

Key facts

StatusOperational
OperatorCDC
Facility power14 MW (range 7 MW to 22 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 11,588 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-33.81829, 150.83671
Websitecdcdatacentres.com.au/eastern-creek-campus

Satellite view

Questions

How much power does CDC Eastern Creek Campus EC5 use?

We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.

Who operates CDC Eastern Creek Campus EC5?

CDC.

Data centers near Minchinbury

More CDC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.