Telstra
Telstra is an operational data center operated by Telstra in Erskine Park, Australia. Our footprint estimate of its power is about 24 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Telstra |
| Facility power | 24 MW (range 12 MW to 39 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,118 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 10,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -33.83089, 150.79488 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telstra use?
We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.
Who operates Telstra?
Telstra.
Data centers near Erskine Park
- Digital Realty Sydney SYD10 1.6 km · 12 MW
- Microsoft SYD06 Data Centre 1.9 km · 20 MW
- CDC Eastern Creek Campus EC5 4.1 km · 14 MW
- CDC Eastern Creek Campus EC4 4.2 km · 17 MW
- CDC Sydney EC1 4.3 km · 17 MW
- Data center in Minchinbury 4.6 km · 12 MW
- AWS Asia Pacific (Sydney) Region Data Centre 4.7 km · 10 MW
- AWS Asia Pacific (Sydney) Region Data Centre 8.0 km · 14 MW
More Telstra data centers
- Telstra InfraCo - St Leonards Data Centre Australia
- Telstra Clayton Data Centre Australia
- Telstra Australia
- Telstra InfraCo - Clayton Data Centre Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.