CDC Eastern Creek Campus EC4 is an operational data center operated by Canberra Data Centres in Minchinbury, Australia. Our footprint estimate of its power is about 17 MW.

Key facts

StatusOperational
OperatorCanberra Data Centres
Facility power17 MW (range 8.7 MW to 28 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 14,490 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asCDC Eastern Creek Campus EC1 · CDC Eastern Creek Campus EC2
Coordinates-33.81868, 150.83759
Websitecdcdatacentres.com.au/eastern-creek-campus

Satellite view

Questions

How much power does CDC Eastern Creek Campus EC4 use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

Who operates CDC Eastern Creek Campus EC4?

Canberra Data Centres.

Data centers near Minchinbury

More Canberra Data Centres data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.