ARE-ON Forrest City
ARE-ON Forrest City is an operational data center operated by Arkansas Research and Education Optical Network (AREON) in Forrest City, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Arkansas Research and Education Optical Network (AREON) |
| Networks | 1 networks PeeringDB. |
| Address | 1802 New Castle Road |
| Coordinates | 35.04010, -90.76806 |
| Website | areon.net |
Power and grid
| Utility | Woodruff Electric Coop Corp (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | Enable Gas Transmission, interstate pipeline, 4.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 475 g CO₂ per kWh (Arkansas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.9%, coal 30.4%, nuclear 22.7%, solar 7.8%, hydro 4.9%. Clean power: 36.6% |
| Industrial power price | USD 0.079 per kWh (Arkansas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.3 °C (2001 to 2025) |
| Cooling degree days | 1,184 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.45 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Medium - High (20-40%) (Arkansas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for ARE-ON Forrest City?
The grid in Arkansas emits about 475 g CO₂ per kWh (2025). Largest sources: gas 32.9%, coal 30.4%, nuclear 22.7%.
Who operates ARE-ON Forrest City?
Arkansas Research and Education Optical Network (AREON).
Data centers near Forrest City
- xAI Colossus 55.6 km · 126 MW
- xAI Colossus Memphis 59.2 km · 352 MW
- Colossus 1 63.1 km · 425 MW
- Microhard 66.2 km · 20 MW
- Colossus 2 66.7 km · 48 MW
- Colossus 2 66.9 km · 1.3 GW
- MACROHARDRR 67.0 km · 16 MW
More Arkansas Research and Education Optical Network (AREON) data centers
- ARE-ON Hope United States
Sources
Correct this page or get the data