TMONE Klang Valley Data Center
TMONE Klang Valley Data Center is an operational data center in Cyberjaya, Malaysia. Our footprint estimate of its power is about 5.4 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.4 MW (range 2.2 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 45,368 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 2.93253, 101.65732 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TMONE Klang Valley Data Center use?
We estimate the facility power at about 5.4 MW. Estimate from building footprint, low confidence.
Data centers near Cyberjaya
- TM ONE CBJ1, Cyberjaya 245 m
- MEASAT DC Cyberjaya 356 m
- AIMS 580 m · 2.2 MW
- CX2 / MY01 Cyberjaya Malaysia 1.8 km
- CSF CX1 / TelcoHub1 Kuala Lumpur 2.2 km
- CX5 / MY02 Cyberjaya Malaysia 2.2 km · 4.5 MW
- Bridge Data Centres - MY02-C2 2.5 km · 13 MW
- Pi DC Datacenter 3.0 km · 3.5 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.