CX5 / MY02 Cyberjaya Malaysia is an operational data center operated by Bridge Data Centres in Cyberjaya, Malaysia. Our footprint estimate of its power is about 4.5 MW.

Key facts

StatusOperational
OperatorBridge Data Centres
Facility power4.5 MW (range 1.8 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 37,224 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asBridge Data Centre - KUL20
AddressMY02, Jalan Cyber Point 2, Cyber 12
Coordinates2.91457, 101.64992
Websitebridgedatacentres.com

Satellite view

Questions

How much power does CX5 / MY02 Cyberjaya Malaysia use?

We estimate the facility power at about 4.5 MW. Estimate from building footprint, low confidence.

Who operates CX5 / MY02 Cyberjaya Malaysia?

Bridge Data Centres.