AIMS
AIMS is a data center under construction in Cyberjaya, Malaysia. Our footprint estimate of its power is about 2.2 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 2.2 MW (range 0.9 MW to 5.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 18,410 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 940 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 2.93775, 101.65736 |
| Website | aims.com.my |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AIMS use?
We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.
Data centers near Cyberjaya
- MEASAT DC Cyberjaya 268 m
- TMONE Klang Valley Data Center 580 m · 5.4 MW
- TM ONE CBJ1, Cyberjaya 821 m
- CX2 / MY01 Cyberjaya Malaysia 2.3 km
- CX5 / MY02 Cyberjaya Malaysia 2.7 km · 4.5 MW
- CSF CX1 / TelcoHub1 Kuala Lumpur 2.7 km
- Bridge Data Centres - MY02-C2 3.1 km · 13 MW
- Pi DC Datacenter 3.5 km · 3.5 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.