The Babbage Centre
The Babbage Centre is an operational data center operated by Getronics in Runcorn, United Kingdom. Our footprint estimate of its power is about 4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Getronics |
| Facility power | 4 MW (range 2 MW to 6.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,328 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | The Heath Business and Technical Park, WA7 4QX, Runcorn |
| Coordinates | 53.32265, -2.73407 |
| Website | getronics.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does The Babbage Centre use?
We estimate the facility power at about 4 MW. Estimate from building footprint, low confidence.
Who operates The Babbage Centre?
Getronics.
Data centers near Runcorn
- Getronics, The Babbage Centre 248 m
- Iron Mountain 12.4 km · 12 MW
- Verizon Warrington 14.0 km · 2 MW
- nLighten Chester 15.6 km · 9.5 MW
- nLighten Chester MAN1 15.9 km
- nLighten Liverpool LPL1 16.1 km · 2.4 MW
- ARO DC2 Kilby House (AIMES) 16.3 km
- Data center in Ashton in Makerfield 18.1 km · 22 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.