nLighten Chester
nLighten Chester is an operational data center operated by nLighten UK in Chester, United Kingdom. Our footprint estimate of its power is about 9.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | nLighten UK |
| Facility power | 9.5 MW (range 4.8 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,943 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | CH1 6LT, Chester |
| Coordinates | 53.24526, -2.92954 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does nLighten Chester use?
We estimate the facility power at about 9.5 MW. Estimate from building footprint, low confidence.
Who operates nLighten Chester?
nLighten UK.
Data centers near Chester
- nLighten Chester MAN1 372 m
- nLighten Liverpool LPL1 11.3 km · 2.4 MW
- The Babbage Centre 15.6 km · 4 MW
- Getronics, The Babbage Centre 15.8 km
- DC01 -Baltic Creative 17.0 km
- ARO DC2 Kilby House (AIMES) 18.2 km
- DC02 - The Tapestry 18.6 km
- LCRDC - King Edward 19.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.