Data center in Ashton in Makerfield
Data center in Ashton in Makerfield is an operational data center in Ashton in Makerfield, United Kingdom. Our footprint estimate of its power is about 22 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 22 MW (range 11 MW to 35 MW) Estimate from building footprint, low confidence. Footprint estimate: about 18,347 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | 2024 |
| Coordinates | 53.47502, -2.63929 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Ashton in Makerfield use?
We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.
Data centers near Ashton in Makerfield
- Verizon Warrington 6.6 km · 2 MW
- Iron Mountain 6.7 km · 12 MW
- Bolton Customer Hosting Centre 14.3 km
- Getronics, The Babbage Centre 17.8 km
- Data center in Urmston 18.0 km
- The Babbage Centre 18.1 km · 4 MW
- ANS - MAN4 20.7 km
- ARO DC2 Kilby House (AIMES) 20.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.