T5@Chicago
T5@Chicago is an operational data center operated by T5 Data Centers in Elk Grove Village, United States. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | T5 Data Centers |
| Facility power | 14 MW (range 7 MW to 22 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,684 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | T5 Chicago II Data Center |
| Address | 200 Innovation Drive |
| Coordinates | 42.02369, -87.97375 |
| Website | t5datacenters.com/chicago |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does T5@Chicago use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
Who operates T5@Chicago?
T5 Data Centers.
Data centers near Elk Grove Village
- Microsoft CHI12 Data Center 190 m · 13 MW
- Prime Data Centers 990 m · 11 MW
- Aligned Data Center 1.4 km · 40 MW
- EdgeConnex Data Center 1.8 km · 7.1 MW
- GigeNET CHI3 1.9 km
- Forsythe Data Centers 2.0 km · 28 MW
- Stream Data Centers 2.2 km · 17 MW
- Equinix CH3 - Elk Grove 2.9 km · 76 MW
More T5 Data Centers data centers
- T5 Data Centers data center in Lithia Springs United States
- T5@Cleveland United States
- T5@Colorado Springs United States
- T5@Charlotte United States
- T5@Atlanta United States
- T5@Augusta United States
- T5@Cincinnati United States
- T5@Cleveland United States
Sources
Correct this page or get the data